diagramming
英 [ˈdaɪəgræmɪŋ]
美 [ˈdaɪəˌgræmɪŋ]
网络 图表; 图表法; 图解法; 图表化; 图形表示
英英释义
noun
- providing a chart or outline of a system
双语例句
- As I go forward and start designing using Rational Rose and a full design methodology with sequence diagramming, we can synchronize the class models of that design into Rational Rapid Developer.
当我们向前进展并开始用RationalRose和顺序图的完全设计方法学时,我们可以同步这种设计的类模型到RationalRapidDeveloper中去。 - In contrast, I think the diagramming features available through plugins such as for jBPM are very useful, from a development standpoint.
相比之下,从开发的角度而言,我认为jBPM插件的图表特征非常有用。 - Thirdly, according to Project Management theory, it discussed Critical Path Method ( CPM) and Precedence Diagramming Method ( PDM) in the light of a designing enterprise.
然后,结合设计企业经常接触的项目管理的理论,结合某设计企业,讨论了项目进度计划关键路径法(CPM)及资源分配管理方法&优先日程图示法(PDM)。 - They provide visual diagramming tools to help you gain insight and knowledge of existing applications or to more easily create and understand new applications.
它们提供可视化的绘图工具,以帮助您了解现有应用程序,或者更容易地创建和理解新的应用程序。 - The software and methodology of event diagramming will be presented, as it relates to stakeholder analysis.
介绍事件图描绘的软件工具与方法,一并提起利害关系人分析。 - I've found that diagramming these dependency relationships using a UML static-model diagram is quite useful.
我发现使用UML静态模型图表示这些依赖关系非常有用。 - Free-form diagramming: The plethora of diagram options provides a complete foundation for free-form diagrams, as they are often used in non-software development scenarios.
自由形态的图样:过多的图表选项为自由形态的图样提供了完整的基础,在非软件开发场景中将会使用到大量的图表选项。 - Use a diagramming tool such as Microsoft Visio.
使用图表工具,譬如微软的Visio。 - This paper discusses on the necessity and importance of experiment course in the higher education teaching activities, probes into the problem of how to quantize the point rating standard in experiment course existing in experiment course teaching, and gives concrete point rating methods and diagramming methods.
论述了实验课在高等教育教学活动中的必要性和重要性,对实验课教学中存在的如何量化实验课评分标准问题进行了探讨,并给出了具体的评分方法和图解方法。 - You are a project manager for a new product development project that has four levels in the work breakdown structure, and has been sequenced using the arrow diagramming technique.
你是一个新产品开发项目的项目经理,这个项目的工作分解结构有四个层次,并按顺序使用箭线图技术。